The Polish plumber
Finish the job, photograph it, and send a proper report — in your customer's language — before you leave the driveway.
Piotr fixes boilers and bathrooms. His customers read Polish; his paperwork used to eat his evenings.
How it works
- Work the job as normal. Photos, typed lines and voice notes land straight on the job.
- Tap Write report. Vitna drafts the structured report from your evidence.
- Check it, edit anything, and export as PDF or Word — in Polish or any of 18 languages.
- Send it before you drive off. The evidence receipt stays with the report.
Measured on a real job: from 6 evidence items to a checked draft in 16 seconds (hosted generation, Vitna cloud). Before Vitna: [BEFORE-TIME — founder to fill: how long this report took by hand].
Report types used: Job completion & handover · Fault found, fixed.
Your report, written for you
The whole app speaks Polish — the report can still go out in the customer's language.
Start something new
Start a job in three lines: who, where, what.
The job
Who, where, what — Anna's kitchen sink siphon, in Polish.
Next step
Six evidence items on the job — one tap writes the report.
The evidence
Photos and the dictated note land straight on the job.
The dictated note
A short note in Polish, kept as evidence and synced to the job.
The check before writing
The report's type, the evidence it will read, where it is written — shown before anything is generated.
Polish app, English document
The report reads in English for the customer — the app stays in Polish. Check and edit anything.
Send / PDF / Word
Export as PDF or Word, or send — in your customer's language.
What the document looks like
Job completion & handover report Sample
Fictional demonstration content — every real report is drafted from the job's own evidence and reviewed by its author.
Summary
Bathroom refurbishment completed at 14 Marlow Road on 12 October 2026. All agreed work finished and checked. Two outstanding items listed below with reasons and dates.
Work completed
Isolation valve replaced on the basin supply; pipework re-supported and pressure tested at 3 bar for 30 minutes — no leaks. Tiling made good to the channel recess; silicone toolled and curing.
Evidence (14 photos)
All 14 photos attached and printed in this document. Photos 6–9 show the pressure test readings at start and end.
Outstanding items
1) Towel-rail delivery expected 16 October — fit booked 17 October, 8:00. 2) Grout seal recommended after 72 hours; customer advised in person.